(216.73.216.189)
About Us
Contact Us
Host with us
Find a Journal
Author Services
Publisher Services
0
Home
Journals
TAI Journal (A Half Yearly Technical Journal of Indian Chapter of TAI)
TAI Journal (A Half Yearly Technical Journal of Indian Chapter of TAI)
TAI Journal (A Half Yearly Technical Journal of Indian Chapter of TAI)
Year:
2017
Volume:
6
Issue:
1
About the Journal
Current Issue
Past Issues
Author Guidelines
Sample Issue
Set Up Alerts
Year:
2017
Volume:
6
Issue:
1
Table of
Contents
RESEARCH NOTE
Advanced Pre-Support for Cross Passages
Author:
G. M. Volkmann
RESEARCH ARTICLE
Subsurface Investigations for Tunnels, Cross-passage, Caverns & Underground Projects
Author:
Sanjay Rana
RESEARCH NOTE
Construction of Cross-Passages for a Twin Tunnel System in Varied Geology for Delhi Metro's CC-27 Project
Author:
R.G. Saini
CASE STUDY
Difficulties in Cross Passage Construction in TBM Tunnel and its Solution from Normet – A Case Study on CMRL, BMRCL, DMRC
Author:
Milon Mukhopadhyay
RESEARCH NOTE
Solutions for Cross Passage Waterproofing
Author:
Abhishek Jain
Use of Synthetic Fibre Reinforced Shotcrete in Underground Structures
Author:
M. M. Madan
RESEARCH ARTICLE
Design and Construction of an Underground Metro Railway Station in Rocky Strata with Hybrid Construction Methodology at New Delhi
Author:
Probal Kundu, Sumantra Sengupta, S.K. Gupta
EDITORIAL
Editorial