1TTSD/EnTSG/ESSA, Space Applications Center (ISRO), Ahmedabad, India
A 5.5m Dia. Thermal vacuum chamber was commissioned in 2002 to cater to the test requirements of electro - optical payloads developed at SAC, Ahmedabad. About 550 meter LN2 transfer lines were installed for supply and distribution of LN2 to various system elements. Out of this about 320 meter lines run in the clean room which were Superinsulated one and rest 230 meter located within the plant room and LN2 yard area were PUF insulated one. Over a period, PUF insulation efficiency got deteriorated and vapor barriers no longer effective. This paper describes the upgrade task accomplished to improve overall loss rate of LN2 lines and overall LN2 consumption. It also describes the technical efforts and experiences gained during up-gradation of PUF insulated lines with S.I. lines ensuring minimum system down time and quality tests performed at segment level and assembly level for these lines.
S.I. lines, PUF insulation, Thermal shroud, LN2