Arya Bhatta Journal of Mathematics and Informatics
  • Year: 2020
  • Volume: 12
  • Issue: 1

Two stage specially structured flowshop scheduling including transportation time, probabilities associated with processing time and job block criteria: A review paper

  • Author:
  • Deepak Gupta1, Manpreet Kaur2,, Vandana2,
  • Total Page Count: 8
  • Page Number: 11 to 18

1Professor and Head, Department of Mathematics, Maharishi Markandeshwar (Deemed to be University), Mullana (Ambala)

2Post M. Sc. Scholars, Department of Mathematics, Maharishi Markandeshwar (Deemed to be University), Mullana (Ambala)

*Email: kaurm5092@gmail.com

** vandanarana452@gmail.com

Online published on 28 May, 2020.

Abstract

The present paper is aimed to provide algorithm minimizing the total waiting time of jobs for specially structured two stage flowshop scheduling. The model includes the transportation time, job block criteria, probabilities are associated with processing time of machines. The algorithm is made clear by numerical illustration. The paper is a review study made by various researchers of the related field. The lemma has been provided on which study is based.

Keywords

Waiting time of jobs, Transportation time, Flow shop scheduling, Processing time, Job block